- REMOVE ELETRICAL OUTLETS ON INTERIOR WALL AND RELOCATE TO SIDE WALLS
- INSTALL NEW 120V OUTLETS ON SIDE WALLS FOR FUTURE BARBER STATIONS (ESTIMATED 6)
- INSTALL CEILING LIGHT FIXTURES (ESTIMATED 5)
- REMOVE 23 LF OF INTERIOR NON LOAD BEARING PARTITION WALL
- REPAIR/REFINISH/REPAINT SIDE WALLS (BLACK) (INCLUDES ALL ROOMS)
- PAINT CEILING TILES (BLACK) (INCLUDES ALL ROOMS)
- PAINT INTERIOR DOORS AND DOOR FRAMES (BLACK)
- INSTALL VINYL FLOORING