Detail

<< Back to Application List

Case Number: COHCA-aUuiTu

Date of Application: 2023-03-28 11:04 pm

Denied


Application Detail

Name JOSEPH DANEL
Mailing Address 4030 alpine aster st San Antonio, TX 78259 US
Phone +12106837247
Fax
Email jrdanel@satx.rr.com
Federal Tax ID # 900527986
Building Address for which Grant is Sought: 12952 Bandera Road # 110 Helotes, TX 78023 US
Ownership Status I will lease the property
Exact size of space to be leased (sq. ft.) 1600
Type of building project Existing businesses making improvements to their existing space, occupying new space of equal or greater size, or redeveloping commercial property.
Proposed Improvement(s) - check all that apply Permanent interior walls and finishes Attached fixtures Flooring Plumbing, Mechanical, Electrical, or HVAC equipment Exterior repair or improvements to façade Interior/exterior demolition Security or fire protection systems Architectural/interior design/permitting fees relate to the improvements
Narrative Description of the Project Scope remodel the entire subway business; new equipment, new ice maker, move soda dispensing unit including new floor section. new outside signs, new pylon sign, paint all customer area, installed new floor in customer area, new FRP panels to protect walls. new tables, chairs and face lift on front equipment.
Photos of Current Condition Download File Download File Download File
Construction Schedule remodeling started novembre 2022 and will be completed by april 2023
Contractor Scope of Work remodel subway shop from original design to newer look based on new floor plans, remove old floor and install new one, remove old wallpaper and installed new one. paint new colors according to plan, doors, installed new FRP panels all around to protect walls. install newer floor around soda dispensing unit to fixe drain, install new ice maker. remove both outside signs, installed new ones as well as pylon sign, lamps and signs for the interior; paint where needed, new hardware on doors. installation of new equipment, tables, chairs, decals on equipment front. clean, remove all boxes and debris. present store remodeled for subway inspection in april 2023
Rendering and/or Architecture Plans Download File Download File
Contractor Cost Estimates the original estimated cost of construction and remodel is at $33700.00 in the next question we have included the projected budjet and the actual cost
Project Budget Download File
Copy of lease or lease extension Download File
Copy of Texas Sales Tax Permit or a Detailed Confidentiality Report from the State Comptroller’s Office, if applicable. Download File
Applicant(s) Signature
Date 03/28/2023
Building Owner's Signature
Date 03/28/2023